Case Studies

Ebury Trial

Trial of Xeroc concrete-to-concrete recycling on the Ebury Bridge Road project

This is the second field trial of Xeroc’s technology. The first was carried out in late 2023 on a project site in Surrey where the processed demolition waste was returned to the site in a standard mix and poured as pedestrian pathways.

Trial of Xeroc's circular concrete menthodology

The purpose of the trial was to demonstrate the feasibility of circular concrete, taking demolished concrete and processing into fresh concrete using Xeroc’s technology.

Two batches of trial concrete were poured as temporary paving.
The project spanned six months from June to November 2023.